Chinese medicine coarse crusher installation

Oct. 20, 2023

1. The machine should be installed in a relatively flat and convenient place.

2. The materials to be processed should be cleaned before work. No hard materials such as metal objects or stones should be mixed into the machine to avoid damage to the internal parts or malfunction.

3. Check whether the parts are firm and reliable before starting the machine. Everything is normal before it can work.

4. Turn on the power, idle for 1-2 minutes, check whether the operation is normal, and wait until everything is normal before feeding. When the machine is working, the operator cannot leave. If the sound is not normal, the power should be disconnected immediately. When processing raw materials, the discharge port should be fastened with a long cloth pocket.

5. Do not use if the power supply voltage is too low when the machine is in use, so as not to damage the motor. When the power supply voltage is normal, the machine is not easily damaged and the production efficiency is high.


Contact us
    • Tel/WhatsApp: +86 153 6525 3931
    • E-mail: info@linglingmachinery.com
    • Fax: +86 510 8600 3712
    • SALES 01: jacklee@linglingmachinery.com
    • SALES 02: zoey@linglingmachinery.com
    • Add.: No.3 Xiyuan Road, Innovation Park, Changjing Town, Jiangyin, Jiangsu, China
follow us

Sitemap